09/12/2009, 07:20 AM
(09/12/2009, 06:56 AM)bo198214 Wrote: So I would consider the regular iteration ofand then just always take the half of the iteration number
.
The interesting thing is that
Graph for b=0.01 with p1=0.941482102273016 and p2=0.0130925205079953.
So why not do regular iteration at that inbetween fixed point?